Skip to content
Sign up

Free Estimate Template

An estimate is your best calculation of what a job will cost before you start. Unlike a quote it is not a fixed price, so it can change when the scope or the price of materials changes.

Fill in the estimate right here and we email you the PDF, or download a free estimate template for Word, Excel or PDF further down, including versions for construction, roofing and landscaping.

The GoKaching team

Personalize your estimate

Add your logo, pick a style, color and font. You see it on the estimate straight away.

Logo

PNG, JPG or WebP, up to 5 MB. Or drop it here. It stays in your browser until you ask for the PDF.

Style

Clean, 1 of 5

Clean

Your logo and number on the left, your details on the right, thin lines.

Brand color

Your colors

Color on your estimate: #0B1E4B

Six characters, like #2563EB. It shows on your estimate as you type.

Add your own with the + or the pipette. Your estimate uses one color at a time.

More colors

Font

Download a free estimate template

Prefer a file? Pick a version for your trade, in Word, Excel or PDF.

Construction Estimate

Estimate no.
E-2031
Date
December 3, 2026

Contractor

Cedar & Stone Remodeling

18 Foundry Street

Raleigh, NC 27601

jobs@cedarstone.example

Customer

Priya Nair

62 Magnolia Drive

Raleigh, NC 27609

Valid for
30 days
Job
Bathroom remodel, 62 Magnolia Drive
Scope
Remove the old bathroom fixtures and tile; rebuild the floor and shower walls; install new tile, vanity and toilet.
Size
5 ft by 8 ft bathroom (40 sq ft floor, 80 sq ft of wall tile)
Estimated duration
2 to 3 weeks after materials arrive
DescriptionAmount
Labor
Demolition and haul-away16 hr × $65.00$1,040.00
Framing and waterproofing24 hr × $65.00$1,560.00
Tile installation30 hr × $70.00$2,100.00
Finish carpentry and paint14 hr × $65.00$910.00
Subtotal: labor$5,610.00
Materials
Floor and wall tile120 sq ft × $9.50$1,140.00
Cement backer board and waterproofing1 lot × $480.00$480.00
Vanity with top and faucet$890.00
Toilet$320.00
Fixtures, hardware and paint1 lot × $360.00$360.00
Subtotal: materials$3,190.00
Subcontractors
Plumbing rough-in and fixture hookup$1,350.00
Electrical: vent fan, GFCI outlet, lighting$780.00
Subtotal: subcontractors$2,130.00
Permits and fees
Building permit$210.00
Subtotal: permits and fees$210.00
Direct cost
$11,140.00
Overhead and profit (15%)
$1,671.00
Contingency (10%)
$1,114.00
Sales tax on materials (6%)
$191.40
Estimated total
$14,116.40

About this estimate

This estimate is based on what we know on the date above. It is not a fixed price. If the scope changes, or we find conditions we could not see before starting, the cost can change. We will tell you first and get your written approval before the total goes up by more than 10%.

Approval (optional)

Customer

Priya Nair

Date

Example with made-up names and amounts. The downloads are blank templates for your own details.

Estimate or quote: which one do you need?

An estimate says “this is what I expect it to cost”. A quote says “this is what I will charge”. The difference matters most when something unknown sits inside the job.

EstimateQuote
PriceApproximate, can changeFixed for the work described
Best whenHours or materials are uncertain, or you cannot see the whole job yetThe scope is clear and you can name one price
What the client agrees toThe plan and the way costs are calculatedThe price
If costs go upYou tell the client first and get approvalYou carry the difference, unless the scope changes

Rules for written estimates differ by state and trade. For home improvement work, some places regulate how far a final bill can go above a written estimate, so check with your state licensing board or a local advisor before you rely on a clause.

How to write out an estimate

  1. Walk the job and list the work. Break it into tasks you can price: demolition, framing, tile, paint.
  2. Price the labor. Hours times your hourly rate for each task, or a price per unit such as per square or per square foot.
  3. Price the materials. Quantity times unit price, plus extra for cuts and waste. In the example above, tile is 120 sq ft for a 40 sq ft floor and 80 sq ft of wall.
  4. Add equipment, subcontractors and permits. Get a number from each subcontractor instead of guessing it.
  5. Add overhead, profit and a contingency. Overhead and profit pay for your business. A contingency covers what you cannot see yet. Pick your own percentages from how past jobs ended up.
  6. Add tax where it applies, then total it. Rules differ by state and by what you sell, so the example taxes materials only.
  7. Write the disclaimer and a validity period, then send it for approval.

What is a cost estimate sheet?

A cost estimate sheet is the worksheet behind the estimate: every cost of the job in one table, grouped as labor, materials, equipment, subcontractors and permits, with overhead, profit and contingency added at the bottom. The Excel versions below are cost estimate sheets that calculate the totals as you type.

Construction and contractor estimate template

The estimate at the top of this page is the construction version. It separates labor, materials, subcontractors and permits, adds overhead and profit and a contingency, and taxes materials only.

How the example adds up

Direct cost is $11,140.00. Overhead and profit at 15% adds $1,671.00 and a 10% contingency adds $1,114.00. Sales tax of 6% on the materials is $191.40. The estimated total is $14,116.40.

Both percentages are applied to the direct cost, not to each other, so the sums stay easy to check. The rates are examples: use the markup your business needs and the tax rules where you work.

Estimate forms for contractors

A contractor estimate form needs more than a price: the job address, a description of the scope, how long it will take and a clear statement that the price can change. This template has all four, and an approval line so the customer can sign off.

Construction estimate template

Labor, materials, subcontractors and permits, with overhead and profit, contingency and tax on materials.

Roofing estimate template

Roofing jobs hide their biggest cost under the shingles. This version prices work per square and adds an allowance for rotted decking, charged only for the sheets you actually replace.

Roofing Estimate

Estimate no.
E-2112
Date
December 4, 2026

Contractor

Summit Roofing Co.

402 Ridge Avenue

Boise, ID 83702

quotes@summitroofing.example

Customer

James Whitfield

17 Birch Street

Boise, ID 83706

Valid for
30 days
Job
Storm damage repair, 17 Birch Street
Findings
Missing shingles on the north slope (about 4 squares) and failed flashing around the chimney.
Roof pitch and access
6/12 pitch, one story, ladder access
Planned start
Within 2 weeks of approval, weather permitting
DescriptionAmount
Labor
Roof inspection, photos and report$150.00
Remove and replace damaged shingles4 sq × $320.00$1,280.00
Rebuild chimney flashing$420.00
Subtotal: labor$1,850.00
Materials
Architectural shingles, matched to the roof4.5 sq × $115.00$517.50
Flashing and sealant1 lot × $96.00$96.00
Underlayment patch1 lot × $85.00$85.00
Subtotal: materials$698.50
Allowance
Replace rotted decking only if found: 3 sheets at $95.00 each3 sheet × $95.00$285.00
Subtotal: allowance$285.00
Subtotal
$2,833.50
Sales tax on materials (6%)
$41.91
Estimated total
$2,875.41

About this estimate

The decking allowance is only charged for sheets we actually replace. We cannot see the decking until the old shingles are off. This estimate is based on what we know on the date above. It is not a fixed price. If the scope changes, or we find conditions we could not see before starting, the cost can change. We will tell you first and get your written approval before the total goes up by more than 10%.

Approval (optional)

Customer

James Whitfield

Date

Example with made-up names and amounts. The downloads are blank templates for your own details.

Roofing estimate template

Priced per square, with an allowance for hidden damage such as rotted decking.

Reading the roof estimate sample

Labor and materials come to $2,833.50 including the decking allowance. Tax of 6% on materials adds $41.91, for an estimated total of $2,875.41.

If no decking is rotted, the final bill is lower by the allowance. If more is rotted, the contractor writes a change order first. That is the main reason this job is an estimate and not a quote.

Landscaping estimate template

Landscaping is priced in many units at once: square feet of pavers, cubic yards of gravel, feet of edging, hours of planting. This version keeps each unit on its own line.

Landscaping Estimate

Estimate no.
E-2145
Date
December 6, 2026

Contractor

GreenLine Landscapes

55 Orchard Road

Madison, WI 53703

hello@greenline.example

Customer

Elena and Tom Brooks

9 Prairie Way

Madison, WI 53711

Valid for
30 days
Job
Backyard patio and planting, 9 Prairie Way
Scope
A 280 sq ft paver patio with gravel base, edging, and a planting bed along the fence.
Site notes
Level backyard, access through the side gate, no utilities in the work area (to be confirmed before digging).
Planned start
April 2027, when the ground has thawed
DescriptionAmount
Labor
Excavation and base preparation280 sq ft × $3.25$910.00
Paver installation280 sq ft × $8.00$2,240.00
Planting and mulching12 hr × $55.00$660.00
Subtotal: labor$3,810.00
Materials
Concrete pavers (280 sq ft plus 10% for cuts)308 sq ft × $4.80$1,478.40
Base gravel and sand6 cu yd × $48.00$288.00
Edging70 ft × $2.10$147.00
Shrubs and perennials18 plants × $24.50$441.00
Mulch4 cu yd × $42.00$168.00
Subtotal: materials$2,522.40
Equipment
Plate compactor and mini excavator, 1 day$325.00
Subtotal: equipment$325.00
Direct cost
$6,657.40
Overhead and profit (10%)
$665.74
Sales tax on materials (5%)
$126.12
Estimated total
$7,449.26

About this estimate

This estimate is based on what we know on the date above. It is not a fixed price. If the scope changes, or we find conditions we could not see before starting, the cost can change. We will tell you first and get your written approval before the total goes up by more than 10%.

Approval (optional)

Customer

Elena Brooks

Date

Example with made-up names and amounts. The downloads are blank templates for your own details.

Landscaping estimate template

Priced per square foot, yard, foot and plant, with equipment and overhead and profit.

Reading the landscaping sample

Direct cost is $6,657.40 before overhead. Overhead and profit at 10% adds $665.74 and 5% sales tax on materials adds $126.12, so the estimated total is $7,449.26.

Note how the pavers are ordered: 280 sq ft of patio plus 10% for cuts is 308 sq ft. Add your own waste factor for each material.

Job estimate template for freelancers and small businesses

Not every estimate has materials. For creative and professional work the estimate is hours times rate, plus any licenses or fees. This version keeps it to a single table.

Estimate

Estimate no.
E-1008
Date
December 2, 2026

From

Lumen Edit Co.

730 Cedar Avenue

Austin, TX 78701

hello@lumenedit.example

Prepared for

Brightside Skincare

Attn: Chloe Park

55 Willow Lane

Denver, CO 80202

Valid for
30 days
Project
Product video editing
DescriptionAmount
Kickoff call and project plan2 hr × $90.00$180.00
Editing: 3 product videos, about 45 seconds each14 hr × $90.00$1,260.00
Motion graphics and captions8 hr × $100.00$800.00
Two rounds of revisions4 hr × $90.00$360.00
Stock music license$59.00
Subtotal
$2,659.00
Estimated total
$2,659.00

About this estimate

This estimate is based on what we know on the date above. It is not a fixed price. If the scope changes, or we find conditions we could not see before starting, the cost can change. We will tell you first and get your written approval before the total goes up by more than 10%.

What is not included

  • Filming, voice-over and any footage you have not sent.
  • Rush delivery under 5 working days.

Approval (optional)

Client

Chloe Park, Brightside Skincare

Date

Example with made-up names and amounts. The downloads are blank templates for your own details.

Job estimate template

For freelancers and small businesses: hours and costs, an estimate notice and an optional approval line.

Reading the sample

$2,659.00 is the sum of 28 hours of work and one music license. The estimate notice says the client hears from you before the total grows by more than 10%.

A work estimate like this one works for editing, design, writing, photography, consulting and similar jobs.

What should you write in an estimate disclaimer?

A good disclaimer says three things: the estimate is not a fixed price, what can change it, and what you will do before the price goes up. All four templates include a version of this wording:

This estimate is based on what we know on the date above. It is not a fixed price. If the scope changes, or we find conditions we could not see before starting, the cost can change. We will tell you first and get your written approval before the total goes up by more than 10%.

Change the percentage to what you are willing to promise. Check whether your state or trade has rules on written estimates, and have a professional read the wording if the jobs are large.

Send it and let them approve online

Contractors lose days waiting for a signed paper estimate. Send it as a link instead.
  1. Step 1

    Create the estimate

    Build it in GoKaching with your saved clients, labor rates and materials, or start from the template here.

  2. Step 2

    Your client approves online

    They open a link, review the lines and approve with a simple electronic signature. You get an audit trail of the approval.

  3. Step 3

    Turn it into a quote or an invoice

    When the work is agreed, send a quote or an invoice with a payment link. Nothing to retype.

Create an estimate online

Always free. 0.25% per payment, capped at $5, plus Stripe's fee.

Frequently asked questions

How do you write out an estimate?

List the tasks, price the labor, price the materials with some extra for waste, add equipment, subcontractors and permits, then add overhead, profit and a contingency. Add tax where it applies, write a disclaimer that the price can change and a validity period, and send it for approval. The steps above go through each one.

Can you provide a free download of the building estimate format in Excel?

Yes. Download the Excel version of the construction estimate template at the top of this page. It calculates every line, the subtotals, overhead and profit, contingency and tax, and the second sheet contains the filled-in bathroom remodel example. Roofing, landscaping and general job estimates come as Excel files as well.

What is the cost estimate sheet?

It is the table behind an estimate that lists every cost of the job, grouped as labor, materials, equipment, subcontractors and permits, with overhead, profit and contingency at the bottom. The Excel templates on this page are cost estimate sheets.

What should I write in an estimate disclaimer?

Say the estimate is not a fixed price, name what can change it (scope changes, hidden conditions, material prices), and promise to tell the client and get approval before the price goes up by more than a percentage you choose. A sample is in the section above.

Is an estimate legally binding?

It depends. An estimate is meant to be approximate, but in some states and trades a written estimate has rules about how far the final price may exceed it. Check with your state licensing board, and use a quote or a contract when you want a fixed price in writing.

How much contingency should I add?

There is no standard figure. The examples use 10% on the construction estimate and an allowance for the one thing the roofer cannot see. Look at how your last jobs ended up compared with the first estimate, and use that.

Send it with GoKaching. Free.

Invoices, quotes and e-signatures with a payment link built in. Always free.

In the United States, your clients can pay with

  • Visa
  • Mastercard
  • ACH Direct Debit
  • Apple Pay
  • Google Pay
  • Cash App Pay
Start for free