Free Estimate Template
An estimate is your best calculation of what a job will cost before you start. Unlike a quote it is not a fixed price, so it can change when the scope or the price of materials changes.
Fill in the estimate right here and we email you the PDF, or download a free estimate template for Word, Excel or PDF further down, including versions for construction, roofing and landscaping.
The GoKaching team
Personalize your estimate
Add your logo, pick a style, color and font. You see it on the estimate straight away.
Logo
PNG, JPG or WebP, up to 5 MB. Or drop it here. It stays in your browser until you ask for the PDF.
Style
Clean, 1 of 5
Download a free estimate template
Construction Estimate
- Estimate no.
- E-2031
- Date
- December 3, 2026
Contractor
Cedar & Stone Remodeling
18 Foundry Street
Raleigh, NC 27601
jobs@cedarstone.example
Customer
Priya Nair
62 Magnolia Drive
Raleigh, NC 27609
- Valid for
- 30 days
- Job
- Bathroom remodel, 62 Magnolia Drive
- Scope
- Remove the old bathroom fixtures and tile; rebuild the floor and shower walls; install new tile, vanity and toilet.
- Size
- 5 ft by 8 ft bathroom (40 sq ft floor, 80 sq ft of wall tile)
- Estimated duration
- 2 to 3 weeks after materials arrive
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Labor | |||
| Demolition and haul-away16 hr × $65.00 | 16 hr | $65.00 | $1,040.00 |
| Framing and waterproofing24 hr × $65.00 | 24 hr | $65.00 | $1,560.00 |
| Tile installation30 hr × $70.00 | 30 hr | $70.00 | $2,100.00 |
| Finish carpentry and paint14 hr × $65.00 | 14 hr | $65.00 | $910.00 |
| Subtotal: labor | $5,610.00 | ||
| Materials | |||
| Floor and wall tile120 sq ft × $9.50 | 120 sq ft | $9.50 | $1,140.00 |
| Cement backer board and waterproofing1 lot × $480.00 | 1 lot | $480.00 | $480.00 |
| Vanity with top and faucet | 1 | $890.00 | $890.00 |
| Toilet | 1 | $320.00 | $320.00 |
| Fixtures, hardware and paint1 lot × $360.00 | 1 lot | $360.00 | $360.00 |
| Subtotal: materials | $3,190.00 | ||
| Subcontractors | |||
| Plumbing rough-in and fixture hookup | 1 | $1,350.00 | $1,350.00 |
| Electrical: vent fan, GFCI outlet, lighting | 1 | $780.00 | $780.00 |
| Subtotal: subcontractors | $2,130.00 | ||
| Permits and fees | |||
| Building permit | 1 | $210.00 | $210.00 |
| Subtotal: permits and fees | $210.00 | ||
- Direct cost
- $11,140.00
- Overhead and profit (15%)
- $1,671.00
- Contingency (10%)
- $1,114.00
- Sales tax on materials (6%)
- $191.40
- Estimated total
- $14,116.40
About this estimate
This estimate is based on what we know on the date above. It is not a fixed price. If the scope changes, or we find conditions we could not see before starting, the cost can change. We will tell you first and get your written approval before the total goes up by more than 10%.
Approval (optional)
Customer
Priya Nair
Date
Estimate or quote: which one do you need?
An estimate says “this is what I expect it to cost”. A quote says “this is what I will charge”. The difference matters most when something unknown sits inside the job.
| Estimate | Quote | |
|---|---|---|
| Price | Approximate, can change | Fixed for the work described |
| Best when | Hours or materials are uncertain, or you cannot see the whole job yet | The scope is clear and you can name one price |
| What the client agrees to | The plan and the way costs are calculated | The price |
| If costs go up | You tell the client first and get approval | You carry the difference, unless the scope changes |
Rules for written estimates differ by state and trade. For home improvement work, some places regulate how far a final bill can go above a written estimate, so check with your state licensing board or a local advisor before you rely on a clause.
How to write out an estimate
- Walk the job and list the work. Break it into tasks you can price: demolition, framing, tile, paint.
- Price the labor. Hours times your hourly rate for each task, or a price per unit such as per square or per square foot.
- Price the materials. Quantity times unit price, plus extra for cuts and waste. In the example above, tile is 120 sq ft for a 40 sq ft floor and 80 sq ft of wall.
- Add equipment, subcontractors and permits. Get a number from each subcontractor instead of guessing it.
- Add overhead, profit and a contingency. Overhead and profit pay for your business. A contingency covers what you cannot see yet. Pick your own percentages from how past jobs ended up.
- Add tax where it applies, then total it. Rules differ by state and by what you sell, so the example taxes materials only.
- Write the disclaimer and a validity period, then send it for approval.
What is a cost estimate sheet?
A cost estimate sheet is the worksheet behind the estimate: every cost of the job in one table, grouped as labor, materials, equipment, subcontractors and permits, with overhead, profit and contingency added at the bottom. The Excel versions below are cost estimate sheets that calculate the totals as you type.
Construction and contractor estimate template
How the example adds up
Direct cost is $11,140.00. Overhead and profit at 15% adds $1,671.00 and a 10% contingency adds $1,114.00. Sales tax of 6% on the materials is $191.40. The estimated total is $14,116.40.
Both percentages are applied to the direct cost, not to each other, so the sums stay easy to check. The rates are examples: use the markup your business needs and the tax rules where you work.
Estimate forms for contractors
A contractor estimate form needs more than a price: the job address, a description of the scope, how long it will take and a clear statement that the price can change. This template has all four, and an approval line so the customer can sign off.
Construction estimate template
Labor, materials, subcontractors and permits, with overhead and profit, contingency and tax on materials.
Roofing estimate template
Roofing Estimate
- Estimate no.
- E-2112
- Date
- December 4, 2026
Contractor
Summit Roofing Co.
402 Ridge Avenue
Boise, ID 83702
quotes@summitroofing.example
Customer
James Whitfield
17 Birch Street
Boise, ID 83706
- Valid for
- 30 days
- Job
- Storm damage repair, 17 Birch Street
- Findings
- Missing shingles on the north slope (about 4 squares) and failed flashing around the chimney.
- Roof pitch and access
- 6/12 pitch, one story, ladder access
- Planned start
- Within 2 weeks of approval, weather permitting
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Labor | |||
| Roof inspection, photos and report | 1 | $150.00 | $150.00 |
| Remove and replace damaged shingles4 sq × $320.00 | 4 sq | $320.00 | $1,280.00 |
| Rebuild chimney flashing | 1 | $420.00 | $420.00 |
| Subtotal: labor | $1,850.00 | ||
| Materials | |||
| Architectural shingles, matched to the roof4.5 sq × $115.00 | 4.5 sq | $115.00 | $517.50 |
| Flashing and sealant1 lot × $96.00 | 1 lot | $96.00 | $96.00 |
| Underlayment patch1 lot × $85.00 | 1 lot | $85.00 | $85.00 |
| Subtotal: materials | $698.50 | ||
| Allowance | |||
| Replace rotted decking only if found: 3 sheets at $95.00 each3 sheet × $95.00 | 3 sheet | $95.00 | $285.00 |
| Subtotal: allowance | $285.00 | ||
- Subtotal
- $2,833.50
- Sales tax on materials (6%)
- $41.91
- Estimated total
- $2,875.41
About this estimate
The decking allowance is only charged for sheets we actually replace. We cannot see the decking until the old shingles are off. This estimate is based on what we know on the date above. It is not a fixed price. If the scope changes, or we find conditions we could not see before starting, the cost can change. We will tell you first and get your written approval before the total goes up by more than 10%.
Approval (optional)
Customer
James Whitfield
Date
Roofing estimate template
Priced per square, with an allowance for hidden damage such as rotted decking.
Reading the roof estimate sample
Labor and materials come to $2,833.50 including the decking allowance. Tax of 6% on materials adds $41.91, for an estimated total of $2,875.41.
If no decking is rotted, the final bill is lower by the allowance. If more is rotted, the contractor writes a change order first. That is the main reason this job is an estimate and not a quote.
Landscaping estimate template
Landscaping Estimate
- Estimate no.
- E-2145
- Date
- December 6, 2026
Contractor
GreenLine Landscapes
55 Orchard Road
Madison, WI 53703
hello@greenline.example
Customer
Elena and Tom Brooks
9 Prairie Way
Madison, WI 53711
- Valid for
- 30 days
- Job
- Backyard patio and planting, 9 Prairie Way
- Scope
- A 280 sq ft paver patio with gravel base, edging, and a planting bed along the fence.
- Site notes
- Level backyard, access through the side gate, no utilities in the work area (to be confirmed before digging).
- Planned start
- April 2027, when the ground has thawed
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Labor | |||
| Excavation and base preparation280 sq ft × $3.25 | 280 sq ft | $3.25 | $910.00 |
| Paver installation280 sq ft × $8.00 | 280 sq ft | $8.00 | $2,240.00 |
| Planting and mulching12 hr × $55.00 | 12 hr | $55.00 | $660.00 |
| Subtotal: labor | $3,810.00 | ||
| Materials | |||
| Concrete pavers (280 sq ft plus 10% for cuts)308 sq ft × $4.80 | 308 sq ft | $4.80 | $1,478.40 |
| Base gravel and sand6 cu yd × $48.00 | 6 cu yd | $48.00 | $288.00 |
| Edging70 ft × $2.10 | 70 ft | $2.10 | $147.00 |
| Shrubs and perennials18 plants × $24.50 | 18 plants | $24.50 | $441.00 |
| Mulch4 cu yd × $42.00 | 4 cu yd | $42.00 | $168.00 |
| Subtotal: materials | $2,522.40 | ||
| Equipment | |||
| Plate compactor and mini excavator, 1 day | 1 | $325.00 | $325.00 |
| Subtotal: equipment | $325.00 | ||
- Direct cost
- $6,657.40
- Overhead and profit (10%)
- $665.74
- Sales tax on materials (5%)
- $126.12
- Estimated total
- $7,449.26
About this estimate
This estimate is based on what we know on the date above. It is not a fixed price. If the scope changes, or we find conditions we could not see before starting, the cost can change. We will tell you first and get your written approval before the total goes up by more than 10%.
Approval (optional)
Customer
Elena Brooks
Date
Landscaping estimate template
Priced per square foot, yard, foot and plant, with equipment and overhead and profit.
Reading the landscaping sample
Direct cost is $6,657.40 before overhead. Overhead and profit at 10% adds $665.74 and 5% sales tax on materials adds $126.12, so the estimated total is $7,449.26.
Note how the pavers are ordered: 280 sq ft of patio plus 10% for cuts is 308 sq ft. Add your own waste factor for each material.
Job estimate template for freelancers and small businesses
Estimate
- Estimate no.
- E-1008
- Date
- December 2, 2026
From
Lumen Edit Co.
730 Cedar Avenue
Austin, TX 78701
hello@lumenedit.example
Prepared for
Brightside Skincare
Attn: Chloe Park
55 Willow Lane
Denver, CO 80202
- Valid for
- 30 days
- Project
- Product video editing
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Kickoff call and project plan2 hr × $90.00 | 2 hr | $90.00 | $180.00 |
| Editing: 3 product videos, about 45 seconds each14 hr × $90.00 | 14 hr | $90.00 | $1,260.00 |
| Motion graphics and captions8 hr × $100.00 | 8 hr | $100.00 | $800.00 |
| Two rounds of revisions4 hr × $90.00 | 4 hr | $90.00 | $360.00 |
| Stock music license | 1 | $59.00 | $59.00 |
- Subtotal
- $2,659.00
- Estimated total
- $2,659.00
About this estimate
This estimate is based on what we know on the date above. It is not a fixed price. If the scope changes, or we find conditions we could not see before starting, the cost can change. We will tell you first and get your written approval before the total goes up by more than 10%.
What is not included
- Filming, voice-over and any footage you have not sent.
- Rush delivery under 5 working days.
Approval (optional)
Client
Chloe Park, Brightside Skincare
Date
Job estimate template
For freelancers and small businesses: hours and costs, an estimate notice and an optional approval line.
Reading the sample
$2,659.00 is the sum of 28 hours of work and one music license. The estimate notice says the client hears from you before the total grows by more than 10%.
A work estimate like this one works for editing, design, writing, photography, consulting and similar jobs.
What should you write in an estimate disclaimer?
A good disclaimer says three things: the estimate is not a fixed price, what can change it, and what you will do before the price goes up. All four templates include a version of this wording:
This estimate is based on what we know on the date above. It is not a fixed price. If the scope changes, or we find conditions we could not see before starting, the cost can change. We will tell you first and get your written approval before the total goes up by more than 10%.
Change the percentage to what you are willing to promise. Check whether your state or trade has rules on written estimates, and have a professional read the wording if the jobs are large.
Send it and let them approve online
- Step 1
Create the estimate
Build it in GoKaching with your saved clients, labor rates and materials, or start from the template here.
- Step 2
Your client approves online
They open a link, review the lines and approve with a simple electronic signature. You get an audit trail of the approval.
- Step 3
Turn it into a quote or an invoice
When the work is agreed, send a quote or an invoice with a payment link. Nothing to retype.
Always free. 0.25% per payment, capped at $5, plus Stripe's fee.
Frequently asked questions
How do you write out an estimate?
List the tasks, price the labor, price the materials with some extra for waste, add equipment, subcontractors and permits, then add overhead, profit and a contingency. Add tax where it applies, write a disclaimer that the price can change and a validity period, and send it for approval. The steps above go through each one.
Can you provide a free download of the building estimate format in Excel?
Yes. Download the Excel version of the construction estimate template at the top of this page. It calculates every line, the subtotals, overhead and profit, contingency and tax, and the second sheet contains the filled-in bathroom remodel example. Roofing, landscaping and general job estimates come as Excel files as well.
What is the cost estimate sheet?
It is the table behind an estimate that lists every cost of the job, grouped as labor, materials, equipment, subcontractors and permits, with overhead, profit and contingency at the bottom. The Excel templates on this page are cost estimate sheets.
What should I write in an estimate disclaimer?
Say the estimate is not a fixed price, name what can change it (scope changes, hidden conditions, material prices), and promise to tell the client and get approval before the price goes up by more than a percentage you choose. A sample is in the section above.
Is an estimate legally binding?
How much contingency should I add?
There is no standard figure. The examples use 10% on the construction estimate and an allowance for the one thing the roofer cannot see. Look at how your last jobs ended up compared with the first estimate, and use that.
Send it with GoKaching. Free.
Invoices, quotes and e-signatures with a payment link built in. Always free.
In the United States, your clients can pay with
- ACH Direct Debit